Development of the transmission network

Every two years, ELES prepares the development plan of the transmission network. In the most recent Plan of the development of the transmission network 2009 -2018 we present the present state of the electric power system in Slovenia as well as the necessary interventions and measures taken in order ensure reliable, secure and high-quality operation of the transmission network as well as to provide its sufficient capacity, especially in the light of the planned construction of new power plants and expansion of distribution network.

Physical and commercial load flows at the borders

 

Load and Generation on Transmission Network
9/8/2010
Daily Generation Forecast: 42927 [MWh]
Realised Generation till 11 am: 17442 [MWh]
Daily Load Forecast: 33378 [MWh]
Realised Load till 11 am: 13646 [MWh]
'Naš stik' (Our Connection) magazine

A new issue of our magazine 'Naš stik' (Our Connection), the magazine of the Slovenia's electricity industry, has been published.

Get to know ELES
ELES, d.o.o., Ljubljana
Hajdrihova ul. 2, 1000 Ljubljana

t: + 386 1 474 30 00 | f: + 386 1 474 39 82
e: info@eles.si

©2009foot_icoElektro - Slovenija, d.o.o.. All rights reserved.