Business User News

In the news, we notify electrical energy market participants about all important events that could impact their operations.

17.06.2022 | Business user news

We would like to inform market participants about the anticipated inclusion of the 400 kV Cirkovce – Hévíz tie-line into operation on 30. 6. 2022. By this step the precondition will be fulfilled to include the border between Hungary and Slovenia into the European coupling projects for day ahead (SDAC) and intraday (SIDC) timeframe.The timeline for tie-line inclusion into cross border capacity calculation processes is as follows: capacity calculation for day ahead allocation v... Read More

08.06.2022 | Business user news

Today, 8.6.2022, the 16 Transmission System Operators (TSOs) of the Core Capacity Calculation Region (Core CCR), together with 10 Nominated Electricity Market Operators (NEMOs), introduced the Core FlowBased Day-ahead Market Coupling. Having a harmonized capacity calculation methodology in place in the Core CCR makes the European electricity system more efficient and robust. This harmonization thereby improves the capacity allocation in the Core CCR and enables the European power grid to transpo... Read More

01.06.2022 | Business user news

With great pleasure the Core Flow-Based Market Coupling project parties announce that the project finished all main deliverables and initiated the final preparations towards the go live of the Core Flow-Based Market Coupling on 08/06/2022, first trading day for delivery on 09/06/2022. The design and procedures are now fully tested, and all required contracts are concluded as well. Project parties are confident to provide a robust and stable system. More info is available in the  attached an... Read More

25.05.2022 | Business user news

Please be aware that a maintenance on Nord Pool EMCO's Shipping Agent system is planned from 01.06.2022 22:30 CEST until 02.06.2022 00:30 CEST. During this time the Shipping Agent services will not be available.XBID trading on ELES-APG border will be affected for the time of maintenance. Read More

25.05.2022 | Business user news

Please be informed that due to maintainance work on the Austrian System Operator APG's Scheduling system the application  will be stoped on 04.06.2022 between 09:00 and approximately 17:00.From 08:45 on and through the mentioned period intraday schedule nominations will not be processed and no matching and confirmation will take place. Confirmed schedules with delivery hours in the above mentioned period remain unchanged. The Day-Ahead Matching will be performed and should not be a... Read More

16.05.2022 | Business user news

Please be informed that due to maintainance work on the Austrian System Operator APG's Scheduling system the application  will be stoped on 24.05.2022 between 18:45 and approximately 23:00.From 18:30 on and through the mentioned period day ahead and intraday schedule nominations will not be processed and no matching and confirmation will take place. Confirmed schedules with delivery hours in the above mentioned period remain unchanged. Read More

05.05.2022 | Business user news

Due to maintenance work on the Slovenian System Operator Scheduling (ESS) application, trading will be stopped on Wednesday, 11.05.2022, between 5:30 and 7:00.Within this period no nominations of schedules for the day ahead and intra-day time scale at all Slovenian borders will be processed by the ESS application. Furthermore, no allocation will be possible via common SIDC project.Confirmed schedules with delivery hours in the above mentioned period will remain unchanged. Read More

20.04.2022 | Business user news

Please be informed that due to maintainance work on the Austrian System Operator APG's Scheduling system the application  will be stoped on 26.04.2022 between 18:45 and approximately 23:00.From 18:30 on and through the mentioned period day ahead and intraday schedule nominations will not be processed and no matching and confirmation will take place. Confirmed schedules with delivery hours in the above mentioned period remain unchanged.  Read More

17.04.2022 | Business user news

We would like to inform market participants that on the request of Italian transmission system operator TERNA, allocation of intraday cross zonal capacity between Slovenia and Italy, for delivery day 17.4.2022, is limited. Additional details are available in following table.IT CZC17_04_2022 Read More

31.03.2022 | Business user news

Please be informed that on Wednesday, April 6th, 2022 between 09:00 CET and 14:00 CET, TSO ELES will perform a planned maintenance of its IT. During this period, some data items from ELES will be temporarily unavailable or incorrectly displayed.After finishing the maintenance, the affected data items will be resubmitted once the IT system is ready. Read More

Page 3 of 325 First 12[3]45 Last

© 2016 ELES, ALL RIGHTS RESERVEDAAAPrivacy Policy/Authors