VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Public consultation on proposal for Fallback procedures within Core CCR

Transmission System operators of  CORE region have in accordance with Article 44 of the EC Regulation 2015/1222 prepared a public consultation document regarding the Fallback procedures for capacity allocation within Core CCR. The proposal is published together with the call for public consultation on ENTSO-E web site.

Public consultation is open until April 27th 2017.