VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

End of limitation of Intra-day capacities allocation

Corrective Actions

Due to better situation in the Austrian electric power system the limitation of Cross-border transfer capacities allocation in Intra-day on SA border has been released with the 16.4.2018, from 10:00h.