VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Reduction of NTC on SI-AT border for 03.10.2018 - correction

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value on SI-AT border will be changed for delivery day 03.10.2018 due to day forecast in Austrian transmission grid to following values:

  • in SI-AT direction to 950 MW from 00:00 to 24:00 and
  • in AT-SI direction to 950 MW from 00:00 to 24:00.