VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Reduction of NTC on SI-AT border for 01.11.2020

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value on SI-AT border for delivery day 01.11.2020 will be reduced in both directions due to planned disconnections in Austrian transmission grid to following values:

  • SI-AT direction: 650 MW, 00:00 - 24:00,
  • AT-SI direction: 650 MW, 00:00 - 24:00.