VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Reduction of NTC on SI-AT border for 20.01.2021

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value on SI-AT border for delivery day 20.01.2021 will be reduced in both directions due to day forecast in Austrian transmission grid to following values:

  • SI-AT direction: 600 MW, 00:00 - 24:00,
  • AT-SI direction: 600 MW, 00:00 - 24:00.