VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Reduction of NTC in direction AT-SI for 28.1.2012 and 30.1.2012

We would like to inform auction participants that due to maintenance in Austrian transmission grid there will be a NTC reduction in direction AT-SI from 950 MW to 650 MW for 28th of January 2012 and for 30th of January 2012. The NTC in direction SI-AT remains unchanged at 950 MW.