VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Reduction of NTC in direction AT-SI for 01.02.2012

We would like to inform auction participants that on the request of Austrian Transmission System operator APG, NTC in direction AT-SI will be reduced for delivery day 01.02.2012 to 850 MW, due to maintenance work in in Austrian transmission grid. The NTC in direction SI-AT remains unchanged at 950 MW.