VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

CANCELATION of NTC reduction in direction AT-SI 7. – 8.8.2012

We would like to inform auction participants that Austrian transmission system operator APG cancelled planned maintenance work in its transmission grid for the period 7.-8.8.2012 due to expected high physical flows through Austrian transmission grid. For that reason the NTC value in direction AT-SI remains unchanged at 950 MW for both days. The additionally cross-border capacities for delivery day 7.8.2012 will be available via intraday allocation.