VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Reduction of NTC in direction AT-SI

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 600 MW in the period from 2. 2. 2013 from 06:00 to 5. 2. 2013 to 24:00 due to the planned maintenance work.

The NTC in direction SI-AT remains unchanged at 950 MW.