VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Increase of NTC in direction AT-SI for 8.2.2013

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC in direction AT-SI will be increased to 950 MW for delivery day 8.2.2013, due to improved conditions in Austrian transmission grid.