VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Reduction of NTC in direction SI-IT for 1.5. and 2.5.2013

We would like to inform market participants that on the request of Italian Transmission System operator TERNA, NTC value in direction SI-IT for delivery day:

  • 1.5.2013 will be reduced to 0 MW from 01:00 to 24:00
  • 2.5.2013 the NTC value will be reduced to 80 MW from 00:00 to 01:00 and reduced to 119 MW from 01:00 to 07:00.


The NTC in direction IT-SI remains unchanged.