VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Intra-day capacity allocation on SI-AT border for 23.5.2013 enabled

Maintenance work on the Austrian System Operator APG's Scheduling system was successfully finished before the scheduled plan and therefore the allocation of intra-day cross-border capacities on SI-AT border is already enabled.