VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Reduction of NTC on SI-AT border for 7.11.2013

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value for delivery day 7.11.2013 will be reduced due to expected high energy flows through Austrian transmission grid to following values:

  • 600 MW for direction SI-AT from 00:00 to 24:00 and
  • 500 MW for direction AT-SI from 00:00 to 24:00.