VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

01.08.2014 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 650 MW for delivery day 3.8.2014 from 00:00 to 24:00 due to expected high physical flows in Austrian transmission grid. Read More

31.07.2014 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 650 MW for delivery day 2.8.2014 from 00:00 to 24:00 due to expected high physical flows in Austrian transmission grid. Read More

31.07.2014 | Business user news

We would like to inform market participants that on the request of Italian Transmission System operator TERNA, NTC value in direction SI-IT for delivery day 03.08.2014 in the period form 08:00 to 18:00 will be reduced to following values: Reduced NTC values The reduction does not affect the already allocated long term capacities. The NTC in direction IT-SI remains unchanged. Read More

30.07.2014 | Business user news

Limitation of Intra-Day cross-border capacities allocation Read More

30.07.2014 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 650 MW for delivery day 1.8.2014 from 00:00 to 24:00 due to expected high physical flows in Austrian transmission grid.  Read More

30.07.2014 | Business user news

Limitation of Intra-Day cross-border capacities allocation Read More

29.07.2014 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 650 MW for delivery day 31.7.2014 from 00:00 to 24:00 due to expected high physical flows in Austrian transmission grid.  Read More

28.07.2014 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 650 MW for delivery day 30.7.2014 from 00:00 to 24:00 due to expected high physical flows in Austrian transmission grid.  Read More

28.07.2014 | Business user news

Due to maintainance work on the Austrian System Operator APG's Scheduling system the application  will be stoped on 30.07.2014 between 18:15 and 21:45.During the mentioned period day ahead and intraday schedule nominations will not be processed and no matching and confirmation will take place. Confirmed schedules with delivery hours in the above mentioned period remain unchanged.  Read More

27.07.2014 | Business user news

Limitation of Intra-Day cross-border capacities allocation Read More

Page 237 of 332 [237]

© 2016 ELES, ALL RIGHTS RESERVEDAAAPrivacy Policy/Authors