VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

14.09.2021 | Business user news

The Nominated Electricity Market Operators (NEMOs) and Transmission System Operators (TSOs) of Local Implementation Project (LIP) 14 confirm the go-live date of 21st September for first deliveries on 22nd September. In the meantime, plans for the integration of Greece and Slovakia during 2022 have been devised by SIDC (Single Intraday Coupling). More in press release. Read More

Page 188 of 690 First 186187[188]189190 Last