VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

15.11.2019 | Business user news

Due to the Go-Live of the SIDC (Single Intraday Coupling) project on ELES-APG and ELES-HOPS border on the 19. 11. 2019, ELES will no longer act as a Capacity allocator for the intraday timeframe on above mentioned borders. Trading on ELES-APG and ELES-HOPS border will be conducted on the SIDC platform provided by NEMOs. Additionally, Explicit Allocation will be available for the Market Participant on ELES-HOPS border. Explicit Allocation will be conducted on CMM platform provided by the SIDC pro... Read More

12.11.2019 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 750 MW for delivery day 14.11.2019 from 06:00 to 20:00 due to planned disconnections in Austrian transmission grid. Read More

11.11.2019 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 750 MW for delivery day 13.11.2019 from 06:00 to 20:00 due to planned disconnections in Austrian transmission grid. Read More

Page 334 of 708 [334]

© 2016 ELES, ALL RIGHTS RESERVEDAAAPrivacy Policy/Authors