VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

15.05.2019 | Business user news

Please be informed that due to maintainance work on the Austrian System Operator APG's Scheduling system the application  will be stoped on 21.05.2019 between 18:45 and approximately 23:00.From 18:15 on and through the mentioned period day ahead and intraday schedule nominations will not be processed and no matching and confirmation will take place. Confirmed schedules with delivery hours in the above mentioned period remain unchanged.  Read More

15.05.2019 | Business user news

This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding the list of standard products for balancing capacity for frequency restoration reserves and replacement reserves pursuant to article 25(2) of the Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing ("EBGL Regulation").The consultation started from Wednesday, 15 May at 00:00 a.m, and will end 31 July at 23:59. Mor... Read More

15.05.2019 | Business user news

This consultation concerns a common proposal developed by all Transmission System Operators ("TSOs") regarding the methodology for a co-optimised allocation process of cross zonal capacity for the exchange of balancing capacity or sharing of reserves in accordance with Article 40 of the Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing ("EBGL Regulation").The consultation started from Wednesday, 15 May at 00:00 a.m, and... Read More

08.05.2019 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 800 MW for delivery day 10.05.2019 from 00:00 to 24:00 due to planned disconnections in Austrian transmission grid.  Read More

07.05.2019 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI for delivery day 09.05.2019 will be reduced due to planned disconnections in Austrian transmission grid to following values: Reduced NTC values Read More

Page 363 of 693 First 361362[363]364365 Last