VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

05.12.2018 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 800 MW for delivery day 07.12.2018 from 00:00 to 18:00 due to planned disconnections in Austrian transmission grid. Read More

04.12.2018 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value on SI-AT border for delivery day 06.12.2018 will be reduced in both directions due to planned disconnections in Austrian transmission grid to following values: Reduced NTC values Read More

03.12.2018 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value on SI-AT border for delivery day 05.12.2018 will be reduced in both directions due to planned disconnections in Austrian transmission grid to following values: Reduced NTC values Read More

02.12.2018 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 800 MW for delivery day 04.12.2018 from 00:00 to 24:00 due to planned disconnections in Austrian transmission grid. Read More

01.12.2018 | Business user news

We would like to inform market participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced to 800 MW for delivery day 03.12.2018 from 06:00 to 24:00 due to planned disconnections in Austrian transmission grid. Read More

29.11.2018 | Business user news

We would like to inform market participants that from 28.11.2018 till 17.12.2018 Core TSOs have issued informal survey on market participants hedging needs related to the preparation of the long-term capacity splitting methodology as foreseen by Article 16 of FCA regulation. The survey is published on Entso-e consultation hub.Market participants in Core CCR are kindly invited to participate in the survey.All details and link to the survey  Read More

Page 383 of 693 First 381382[383]384385 Last