VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

10.03.2012 | Business user news

Unplanned unavailability of significant consumption unit Talum Read More

09.03.2012 | Business user news

Unplanned unavailability of TEŠ 4 Read More

09.03.2012 | Business user news

We would like to inform Market Participants that due to a stressed situation in APG grid and expected related uncertainties, critical network situations may occur in April. To secure safe network operation, particularly as of mid-April, NTC reductions in the direction AT-SI might be necessary. As a consequence, within this period of time, less capacity could be available in the daily auction process. However, from the current perspective, no concrete implications can be estimated.  Read More

09.03.2012 | Business user news

According to Auction Rules Elektro - Slovenija, d.o.o is publishing Auction Specifications for monthly auction in direction Croatia-Slovenia for the month April 2012.Auction specifications for monthly auction for April 2012 in HR-SI direction Read More

08.03.2012 | Business user news

Unplanned unavailability of significant consumption unit Talum Read More

07.03.2012 | Business user news

Unplanned unavailability of significant consumption unit Talum Read More

06.03.2012 | Business user news

Unplanned unavailability of significant consumption unit Talum Read More

22.02.2012 | Business user news

End of limitation of Intra-day capacities allocation Read More

22.02.2012 | Business user news

Limitation of Intra-Day cross-border capacities allocation Read More

20.02.2012 | Business user news

We would like to inform auction participants that on the request of Austrian Transmission System operator APG, NTC value in direction AT-SI will be reduced due to forced outage of one of the transmission lines in the Austrian transmission grid as a consequence of an avalanche. NTC value shall be reduced for delivery day 22.02.2012 as follows: - between 00:00-08:00 and between 18:00-24:00 to 650 MW, - between 08:00-18:00 NTC value remains unchanged, at 950 MW. The NTC in direction SI-AT remains u... Read More

Page 675 of 707 [675]

© 2016 ELES, ALL RIGHTS RESERVEDAAAPrivacy Policy/Authors