Business User News

In the news, we notify electrical energy market participants about all important events that could impact their operations.

01.09.2009 | System Services

For determination of energy price of tertiary control reserve, the client is additionally publishing the following explanation to Annex 9. »The bidder can specify the price for tertiary control reserve based on the price index of fuel, which is used for generating electricity with regulating unit(s). At the bid selection prices, the client will consider the offered energy price, while the contracting energy price can differ from the offered price, such that the difference represents o... Read More

27.08.2009 | System Services

Elektro-Slovenija, d.o.o. publishes Auction for purchase of ancillary services for 2010. All interested bidders are invited to submit their application for prequalification recognition and, on the basis of a successful qualification, participate in the auction for the purchase of: reactive power reserve for voltage control, black start capability, ±80 MW of active power reserve for secondary frequency control, 348 MW of active power reserve for tertiary frequency control, consisting ... Read More

25.03.2009 | System Services

Participants of electric energy market are invited to sign the General contract for sale and purchase of electric energy for needs of transmission system operator. Elektro-Slovenija, d.o.o. will conclude the contracts with separate market participants in order to buy/sell energy to ensure undisturbed operation of the Slovenian electric power system.For additional information and conclusion of the contract please contact Ms. Mojca Cafuta (tel.: +386 1 474 2649, e-mail: mojca.cafuta@eles... Read More

15.09.2008 | System Services

The results of the repeated Auction for the purchase of electricity for covering energy losses in the transmission network for the year 2009.On the 15th of September, 2008 ELES performed the repeated auction for the purchase of energy to cover losses on the transmission system for the year 2009. Read More

08.09.2008 | System Services

The results of the Auction for the purchase of electricity for covering energy losses in the transmission network for the year 2009.On the 8th of September, 2008 ELES performed the auction for the purchase of energy to cover losses on the transmission system for the year 2009. Read More

05.09.2008 | System Services

On September 8th, 2008 ELES, Slovenian Transmission System Operator has performed an Auction for the purchase of minute reserve power for tertiary frequency control outside Slovenia in 2008, where the bid from company Energy Financing Team AG has been selected (Purchase price 62000 €/MW, Price of use 235,00 €/MWh). Read More

14.08.2008 | System Services

All interested bidders are invited to submit, in accordance with the Auction Rules, an application for prequalification recognition and, on the basis of a successful qualification, participate in the auction for the purchase of minute reserve power up to 145 MW.Bidders are to deliver their applications by registered mail to the Buyer’s address: Elektro-Slovenija, d.o.o., Hajdrihova 2, Ljubljana, furnished with the inscription: »ANCILLARY SERVICES – CONFIDENTIAL, DO NOT OPE... Read More

14.08.2008 | System Services

All interested bidders are invited to submit, in accordance with the Auction Rules, for the purchase of energy to cover losses on the transmission system in the year 2009, an application for their participation in the auction for the purchase of energy to cover losses on the transmission system in 2009. The subjects of auction are: 25 MW of base load product and 5 MW of peak load productThe application for participation shall be submitted at the latest on Monday, 01st of September 2008, til... Read More

20.11.2007 | System Services

On the 20th of November, 2007 ELES successfully performed the auction for the purchase of energy to cover losses on the transmission system for the year 2008 (auction results). Read More

15.11.2007 | System Services

On the 15th of November, 2007 ELES performed the auction for the purchase of energy to cover losses on the transmission system for the year 2008 (Auction results). Read More

Page 7 of 8 First 456[7]8 Last