Implementation of European regulations

ELES as the transmission system operator of the electric power network is in accordance with the legislation obliged to notify the public about the procedures of adoption and implementation of European regulations in the field of electric power transmission.

News

Generation and Load Data Provision Methodology (GLDPM)

GLDPM methodology is closely linked to the CGM and it sets out requirements with respect to the delivery of the generation and load data required to establish the common grid model.

This methodology sets out the generation and load data which may be required by TSOs in order to establish the common grid model. 

More information on the matter on ENTSO-E site.